Air conditioning, plumbing, electrical, ventilation, tiling, painting and joinery sit on one licence and one crew. No three subcontractors blaming each other for the same delay.
Most flats need three or four of these at once. That is the whole reason to hire one contractor instead of coordinating a schedule between strangers.
Split and ducted servicing, chemical coil cleaning, drain lines, gas charging, replacements and new installation.
Leaks, blockages, water heaters, mixers and sanitaryware, full bathroom re-pipe during renovation.
Distribution board work, circuits, sockets and lighting, fault tracing, load changes coordinated with DEWA.
Floor and wall tiling, waterproofing under wet areas, large-format and stone, grout renewal.
Full repaints, patching and skim, ceilings, wallpaper removal, handover touch-up between tenancies.
Wardrobes, kitchen units, doors and skirting, built-in storage, repairs to existing fitted furniture.
In Dubai, interior work cannot legally start without building approval — including work as small as replacing tiles. Contractors who skip this get the stop-work notice, and the flat sits unfinished. We run the process as part of the job.
No-objection certificate from the owners association or developer, with the base-build drawings they hold.
Layout and MEP drawings prepared to the standard the authority expects, not sketched on site.
Fit-out permit filed, with civil defence or DEWA involved where fire systems or electrical load change.
Final inspection and completion certificate, so the file on the unit closes clean for the owner.
A failure in a let unit costs the booking, the refund and the review. The contract is priced so that reporting a fault is never a decision anyone has to weigh.
| Units under contract | 1-bed | 2-bed | Onboarding survey |
|---|---|---|---|
| 10 – 29 | AED 1,150 | AED 1,500 | Free |
| 30 – 99 | AED 980 | AED 1,320 | Free |
| 100 + | AED 850 | AED 1,120 | Free |
Covers AC, plumbing and electrical. Excludes 5% VAT. Parts at cost + 20%, quoted before fitting. Two-year term takes 10% off year one.
One includes chemical coil cleaning, plus a plumbing and electrical inspection. Booked around your calendar.
Four-hour on-site response May to September, next working day the rest of the year.
Before and after, filed by unit, so condition at handover is never an argument.
What was serviced, what failed, what is about to. A sheet you can pass straight to the owner.
An AC service is easy to fake and hard to verify. We record the temperature split before and after, so you can see the unit is cooling rather than trust that someone turned up.
Send photos on WhatsApp and we come back with a fixed scope and a fixed price, including which approvals the building will ask for.
